The construction stages of another project by Shokofa Sanat Pooya Company were completed and this project was moved to the installation site.
Completing the construction of another project by Shokofa Sanat Pooya
According to the public relations report of Pooyan Industrial Group; The construction stages of the Ejector Stack project were completed by Shokofa Sanat Pooya and this project was moved to the installation site.
Ejector stack (ES) made in Shokofa Sanat Pooya company with a height of more than 50 meters, minimum diameter of 3 and maximum diameter of 6, with a weight of 90 tons to be carried as best as possible by this collection, considering the way of installation, in 7 separate parts it was made.

The construction of these parts was completed in 6 months due to assembly and high welding volume. Also, according to the use of these parts, 450 degree coating has been used for painting.
It is worth noting that, in the operation of high-temperature reduction furnaces, using an ejector stack (ES), they provide the necessary traction for the exit of gases.