Definitive delivery of Yazd agate tile factories project by Shokofa Sanat Pooya

The project of construction and installation of sheds for Aqeeq tile factories in Yazd by Shokofa Sanat Pooya Company was completely completed.

Definitive delivery of Yazd agate tile factories project by Shokofa Sanat Pooya

According to the public relations report of Pooyan Industrial Group; The construction and installation project of 5,000 tons of metal structures of Aqeeq tile factories in Yazd was completed on time by Shokofa Sanat Pooya Company and this project was given final delivery.

In addition to the delivery time of this project, which was based on the time specified in the contract, the issue of safety and the absence of accidents is one of the most important features and noteworthy points of this project.

بیشتر بخوانید: Examining the conditions of cooperation between the Korean delegation and Pooyan Industrial Group

The project of Yazd agate tile factories started in 1401 with the minimum construction and installation time and also with the minimum personnel and it was completely finished a while ago.

تحویل قطعی پروژه کارخانجات کاشی عقیق یزد توسط شکوفا صنعت پویا

Previous Post

Examining the conditions of cooperation between the Korean delegation and Pooyan Industrial Group

Next Post

Recording of concreting record by Shokofa Sanat Poya

Leave a Reply

Your email address will not be published. Required fields are marked *